Assembly and testing of substation GIS 11kV – Meter section 5 and 6 Assembly and testing of substation GIS 11kV associated with the receptor – Metro project, section 5 and 6. PLACE Bogotá DATE 2024-2025 Copyright © 2024, JCAG S. A. S - Powered by As The Palm Of My Hand